For this project assignment, we have to produce a report and layout drawings based on our site visit we went, which is the 3K MPSJ at Subang Jaya. In a group of 4, we had divided ourselves in 2 part, two people doing the report while the other two do the layout drawing.
I was in charged of the report together with Goh Pei San, while Chia Kha Wen and Thian Bing Xun did the layout drawing. For the report, Pei San and I divide our workload into parts, as I take the introduction, enviroment of the site, natural physical feature, vegetation, sensory and building services. Both of us still help each other when we had difficulties on our part. By keeping in track with our other group members, we managed to finish everything and hand our submission in one piece. To my group members, thank you for your hard work.
We need to include UBBL(Uniform Building By-Laws 1984) Acts into the report as well. I realize how important it is to understand the laws before designing a building. It is for the safely of the people and the building as well. There are some laws acts that I don't quite understand fully yet, so I will need to ask my lecturers about it in the future.
We need to include UBBL(Uniform Building By-Laws 1984) Acts into the report as well. I realize how important it is to understand the laws before designing a building. It is for the safely of the people and the building as well. There are some laws acts that I don't quite understand fully yet, so I will need to ask my lecturers about it in the future.